Fibrewise Consulting

Vanuatu National Fibre Program

Between January and July 2024, Fibrewise Consulting delivered a full fibre survey and multi-stage design program across Port Vila and surrounding regions in Vanuatu, supporting Interchange Limited's telecommunications upgrades. The work confirmed existing routes, identified constraints and produced detailed fibre designs for both government and international landing station connectivity.

Trench with new conduit installed for the Vanuatu national fibre programRoadside trench and conduit installation in VanuatuTraffic control and roadside works during Vanuatu fibre installationConduit run along a Vanuatu road corridorLocal community alongside the Vanuatu fibre route works

Project detail

A national network, planned corridor by corridor.

The Challenge

Interchange Limited needed a clear picture of existing fibre infrastructure across Port Vila before committing to a national upgrade program, along with design options weighing upgrading existing conduit against building new routes. With two international landing stations involved, the designs also needed to support future connectivity requirements beyond the immediate network.

Our Approach

We carried out a full survey on the ground across Port Vila and the Mele corridor, including two villages, using GPS tagged photos and Konect software mapping to validate existing fibre infrastructure. From that data, we produced five project stages and seven fibre design packages, each offering an existing-conduit option and a new-build route, giving Interchange Limited a clear comparison for every corridor.

The Solution

The program delivered accurate multi-stage fibre designs, verified pit locations and route constraints, and connectivity designs for two proposed international landing stations. This gave Interchange Limited a reliable foundation for Vanuatu's future fibre expansion and government network upgrades.

Results

Key Outcomes

  1. Five project stages and seven fibre design packages delivered
  2. Full corridor survey across Port Vila and Mele, including two villages
  3. Dual-path design options produced for every major route
  4. Connectivity design completed for two international landing stations